The Plans on Board area of our web site is a members benefit area. To access this information you must be a SMVCA member. Please use the links below to complete an application.


This information is furnished for the convenience of members and no warranty is made as to the accuracy of any information contained herein, including, but not limited to names, dates, places or amounts. Anyone relying on this information does so at their own risk and shold personally confirm such information directly with the appropriate source other than the Santa Maria Valley Contractors Association, Inc. Call SMVCA for pre-bid conferences and addenda.

The Association is always exploring other membership programs that will add value to your membership.
LIBRARY RENOVATION PROJECT
Bid Date : Monday, July 07, 2008
Involves : Comprehensive renovation of an existing kitchen-library building into an expanded library facility.

PARDALL ROAD ENHANCEMENT PROJECT
Bid Date : Tuesday, July 08, 2008
Involves : Pardall road enhancement project.

TEFT STREET & THOMPSON AVE. WATERLINE RELOCATION PROJECT
Bid Date : Tuesday, July 08, 2008
Involves : Traffic control, removal of existing water pipelines, earthwork, trench resurfacing, shoring, excavation, installation of water pipelines, concrete encasement of existing sanitary sewer, restore trenches.

LA CUESTA CONTIUATION HIGH MODERNIZATION-REBID
Bid Date : Tuesday, July 08, 2008
Involves : Modernization and ADA work related to limited site demolition, installation of stair and walkway, restroom renovations, concrete, paving, painting, rain gutters, door hardware, carpentry, electrical, plumbing, and minor utility improvements, etc.

LABORATORY RENOVATION 3166
Bid Date : Wednesday, July 09, 2008
Involves : Selective demolition and subsequent renovation of room 3166, laboratories in Harold Frank Hall Building 556. Including, but not limited to new walls, doors and frames, interior finishes, fume hood, mechanical, electrical and lighting.

WATER RECLAMATION FACILITY SECONDARY ISLAND
Bid Date : Wednesday, July 09, 2008
Involves : In general, work consists of removing old piping, pump and motor and installing new City-furnished replacement pump and motor.

SHANDON HIGH SCHOOL DRAINAGE IMPROVEMENTS
Bid Date : Thursday, July 10, 2008
Involves : Removal of concrete and asphalt paving, grading, storm drainage system, and concrete paving.

RAILROAD SQUARE
Bid Date : Thursday, July 10, 2008
Involves : Historic renovation of existing 3 story URM and new construction of office wing (5,000 SF). Sub-bids only from all trades except architectural and structural.

CHORRO-HATHWAY WATER AND SEWER IMPROVEMENTS
Bid Date : Thursday, July 10, 2008
Involves : Install new waterlines and sewerlines and tie over services. Install new fire hydrant assemblies. Abandon existing waterlines and sewerlines, hydrants and laterals.

KAUTZ CHEVRON
Bid Date : Friday, July 11, 2008
Involves : Scrape and rebuild gas station: new food mart, carwash, canopy, fuel islands, and sitework. Sub-bids only from all trades except demo, grading, utilities, fueling, cabinets, and cooler.

STREET RECONSTRUCTION-WEST CRESTON STREET/ MARLBERRY STREET / PALMETTO
Bid Date : Tuesday, July 15, 2008
Involves : Reconstruction of valley gutters, spandrels, curb and gutter, handicap ramps, pavement striping and markings, and asphalt concrete pavement on West Creston Street, Marlberry Street and Palmetto Drive and all work necessary to render the facility complete and opperational.

FINAL COVER @ CHINA GRADE SANITARY LANDFILL
Bid Date : Wednesday, July 16, 2008
Involves : Clearing and grubbing, excavation, hauling and placement of a fianl earthen cover (evapotranspiration cover), general earthworks, surface water facilities, groundwater monitor well extensions, removal and reconstruction of existing landfill gas pipes and gas system modifications, construction of a pan lysimeter, geosynthetics liner installations, site security construction, placement of asphalt concrete and erosion control.

LA LOMA CURB AND GUTTER IMPROVEMENTS
Bid Date : Wednesday, July 16, 2008
Involves : Construction of curb and gutter, curb returns, portions of sidewalk and asphalt concrete paving.

VIA AVENUE BRIDGE REPAIRS
Bid Date : Thursday, July 17, 2008
Involves : Construct and complete the construction of the Via Avenue Bridge Repairs.

STAGE COACH ROAD STORM DAMAGE REPAIRS
Bid Date : Thursday, July 17, 2008
Involves : Stagecoach Road storm damage repairs cable mesh drapery system 3.5 miles Southeast of State Highway 154 near the City of Santa Barbara.

SANTA MARIA RIVER LEVEE PILOT CHANNEL PROJECT
Bid Date : Tuesday, July 22, 2008
Involves : Excavation and removal within the Santa Maria River bed or dirt, soil, earth, silt, trees, vegetation, debris or othe materials, in, over, under and across the real property shown on the plans, to serve the Flood Control PURPOSE.

SEWER PIPE RE-ROUTE
Bid Date : Wednesday, July 23, 2008
Involves : Install 775 L.F. (130 L.F. directional drilling) of 10" PVC sewer line and three manholes. Resurface trench line to match existing.

PAVEMENT REHABILITATION 2008 RAYMOND STREET NEIGHBORHOOD
Bid Date : Wednesday, July 23, 2008
Involves : Surface preperation & crack sealing, full depth AC base repair, cold milling and taper key, tree root pruning, removal and replacement of PCC sidewalk, curb & gutter, conventional AC overlay, traffic signal loop installation, pavement delineation & striping, and survey monument adjustment & replacement.

SIERRA HIGHWAY FROM AVENUE A TO ROSAMOND BLVD
Bid Date : Wednesday, July 23, 2008
Involves : Cold planing asphalt concrete; constructing an asphalt concrete overlay with pavement reinforcing fabric.

PAVEMENT LIGHTS AT CROSSWALKS
Bid Date : Thursday, July 24, 2008
Involves : Los Osos Valley Road in Pavement Lights at crosswalks Fairchild Way and Sunset Drive.

IN AND NEAR HARMONY (PLANT ESTABLISHMENT)
Bid Date : Thursday, July 24, 2008
Involves : In and near Harmony from 0.2 mile south of Harmony Valley Road to 0.6 mile North of Harmony Valley Road (Plant Establishment).

TYPE II SLURRY SEAL - MOBILE HOME PARK
Bid Date : Tuesday, July 29, 2008
Involves : Mobile Home Park pavements and fire station driveway.

EL COLEGIO ROAD IMPROVEMENT
Bid Date : Thursday, July 31, 2008
Involves : The construction of new west bound vehicle lanes & Class II bike lane from Stadium Road, through Los Caneros intersection.

PAVEMENT REHABILITATION BARDSDALE AREA
Bid Date : Tuesday, August 05, 2008
Involves :

 
MEMBER LOGIN
Login :
Password :
View Roster
Advertise your business with us.

 

Home  l  Members  l Leadership  l  Projects  l  Links  l  Contact Us  l  Benefits  l  Programs  l  Levels  l  Events  l  Application