| HARDER STADIUM CONCESSIONS |
| Bid Date : Friday, September 03, 2010 |
Involves : Provide site utilities to accommodate an owner furnished concessions trailer, and accomodate two remote concession stand locations. |
|
| CUESTA PERFORMING ARTS COMPLEX PARKING LOT |
| Bid Date : Tuesday, September 07, 2010 |
Involves : See plans and specifications. |
|
| SATOC T.O. - BUILDING 120, D/B CFFT TRAINING SIMULATION BUILDING |
| Bid Date : Tuesday, September 07, 2010 |
Involves : Design/Build for restoration and modernization of Building 120 at Camp Roberts, California.
*All bids are due no later than the above mentioned time. However, due to the proximity to the prior Labor Day weekend, any effort to submit your proposal by Friday, September 3 or earlier would be greatly appreciated. |
|
| CONSTRUCT STUDENT LEARNING CENTER BUILDING 9170 |
| Bid Date : Tuesday, September 07, 2010 |
Involves : Furnishing all labor, materials, and equipment in connection with Student Learning Center, Building 9170 at Vandenberg Air Force Base. A new 2,000 square foot training facility including a study room, conference room, men's and women's restrooms, data room, janitors closet, and for future kitchenette. |
|
| ELEVATOR ADDITION & ADA IMPROVEMENTS |
| Bid Date : Wednesday, September 08, 2010 |
Involves : Project consists of a new elevator and shaft along with exterior ADA improvements.
The intent of the elevator shaft dimensions is to meet minimum ADA and California Medican Emergency Elevator Code requirements for a guerney. We can modify the shaft dimensions to meet these requirements if the elevator selected has slightly different dimensional requirements.
Bid Scope: Demolition, grading, concrete, structural steel, rough carpentry, lath & plaster, drywall ans painting. |
|
| BREN HALL LAB VENTILATION, BREN HALL-BUILDING 521 |
| Bid Date : Wednesday, September 08, 2010 |
Involves : The installation of a Demand Control Ventilation System (DCVS) on floors 1&2. |
|
| FIRE-AVILA-APPARATUS BAY EXPANSION |
| Bid Date : Thursday, September 09, 2010 |
Involves : Expand the existing fire station approximately 1750 S.F. by building an additional parking bay and adding to the rear of the two existing parking bays. |
|
| PACHECO SCHOOL RAMP IMPROVEMENTS |
| Bid Date : Thursday, September 09, 2010 |
Involves : Remove existing curb ramps and install new curb ramps to meet ADA requirements. |
|
| HSSB TOWER AND ARCADE PVC ROOF REPLACEMENT HSSB BUILDING 515 |
| Bid Date : Friday, September 10, 2010 |
Involves : Removal of existing builtup roofing system and replacement with single ply PVC roofing system at the tower and arcade areas of the HSSB Building. |
|
| FRIEDENBERG SFR |
| Bid Date : Friday, September 10, 2010 |
Involves : New Single Family Residence. All phases needed. Cost saving "or equal" products are highly welcomed but need to be separated out of base bid. RFI's need to be submitted to contractor 48 hours prior to bid deadline. |
|
| SANTA CATALINA RESIDENCE HALL POOL RENOVATION PROJECT |
| Bid Date : Tuesday, September 14, 2010 |
Involves : Complete renovation of the pool into ADA and VGBA compliance and reduce energy consumption and energy costs. |
|
| SHELL BEACH VETERANS HALL & PISMO BEACH POLICE PAINTING PROJECTS |
| Bid Date : Tuesday, September 14, 2010 |
Involves : See plans and specifications. |
|
| SEWERLINE REPLACEMENTS 2010-2011 -PROJECT 2- |
| Bid Date : Wednesday, September 15, 2010 |
Involves : Upsizing existing sanitary sewer pipelines, replacing existing manholes and recommecting existing laterals to the new sanitary sewer pipeline as shown on plans. The method for rehabilitation of the existing sanitary sewer pipe shall be the pneumatic pipe bursting. |
|
| STREETSCAPE PHASE III |
| Bid Date : Wednesday, September 15, 2010 |
Involves : Sidewalk removal and replacement with decorative downtown streetscape including colored sidewalks, street trees, lighting and decorative pavers. Removal of bridge sidewalk and replacement with decorative lighting, colored sidewalk and stamped concrete. Roadway excavation and reconstruction including cold planning surface of existing asphalt concrete pavement, furnishing, spreading and compacting hot mix asphalt (HMA), striping and utility cover adjustment. |
|
| OAK PARK DEVELOPMENT |
| Bid Date : Wednesday, September 15, 2010 |
Involves : Proposition to develop a 300 unit affordable housing community in Paso Robles, CA. |
|
| HACIENDAS DEVELOPMENT |
| Bid Date : Wednesday, September 15, 2010 |
Involves : Design/Build project proposes to develop a 99 unit affordable housing community in Salinas Ca. |
|
| CONSTRUCT DINING FACILITY |
| Bid Date : Wednesday, September 15, 2010 |
Involves : Contractor shall furnish all material, labor, equipment and transportation to complete the construction of a pre-engineered building and ancillary systems - the Camp Roberts Dining Facility. |
|
| LA LOMA ADOBE STABILIZATION |
| Bid Date : Thursday, September 16, 2010 |
Involves : Structural stabilization, adobe brick wall repair and security barriers of the La Loma Adobe. |
|
| ASPHALT OVERLAY 2010 |
| Bid Date : Thursday, September 16, 2010 |
Involves : See plans and specifications. |
|
| LA VIGNA II |
| Bid Date : Friday, September 17, 2010 |
Involves : The plans being provided for bidding purposes have been submitted to the City of Santa Maria as a first plan check submission. It is assumed changes will be minor to the current set of bid plans. Approved plans will be distributed upon identifying winning bidder and any changes in scope or cost must be submitted prior to award of contract. The contract will be based on the approved plans and specifications. |
|
| COLLEGE PARK IMPROVEMENTS |
| Bid Date : Wednesday, September 22, 2010 |
Involves : Work consists of construction of a perimeter roadway with two parking lots; five soccer fields; wetland detention basin improvements; a concession/restroom building; a maintenance building, a restroom building; landscaping and rehabilitation of existing perimeter road & parking lot. |
|
| EL EMBARCADERO ENHANCEMENT PROJECT PHASE I |
| Bid Date : Thursday, September 23, 2010 |
Involves : Construction of new storm drainage system and upgrading and reconfiguring an existing storm drain system. Removal and reconstruction of existing curb, gutter spandrel, cross gutter and sidewalks. Installation of conduits, pull boxes, vaults and related items necessary for the undergrounding of the overhead utility lines. Removal and reconstruction of roadway structural section, slurry seal and paint pavement striping and markings.
|
|
| MARIA VISTA ESTATES, PHASE 2 DRAINAGE |
| Bid Date : Thursday, September 23, 2010 |
Involves : All necessary work to complete Maria Vista Estates, Phase 2 Drainage Basin and Outlet Improvements in Nipomo, CA. |
|
| SCADA SYSTEM DESIGN/BUILD |
| Bid Date : Thursday, September 23, 2010 |
Involves : Design and installation of a new operating system for the SCADA System and to transform the current communication protocol into a talkaround/disributed system for the City's Water Division. |
|
| UPGRADE WATER LINES- SUNSET/PANORAMA |
| Bid Date : Thursday, September 23, 2010 |
Involves : Mobilizing; preparing and implementing traffic control plans; potholing and locating existing underground utilities; maintaining water service to customers during construction; excavation; shoring and bracing; safety; dewatering; saw cutting; removal and disposal of portions of existing pipelines; pipe embedment; pipe laying; connecting to existing facilities; backfill and compaction; testing; pavement replacement; and ancillary work as specified herein and as shown on the drawings. |
|
| RETROFIT ORNAMENTAL LIGHT FIXTURES |
| Bid Date : Thursday, September 23, 2010 |
Involves : Removal of existing metal halide lamps and ballast and replace with induction retrofit kit and generator at various locations in the city; and proper disposal of metal halide lamps and ballast in accordancewith EPA regulations and codes; all as specified in these documents and to the satisfaction of the CIty.
|
|
| REMODEL 19 W. CARILLO STREET |
| Bid Date : Tuesday, September 28, 2010 |
Involves : NON PREVAILING WAGE. The scope of the work includes hard & soft demolition, concrete, rebar, ltwt. concrete, masonry, signage, steel handrail, structural & miscellaneous metals, ornamental iron, rough carpentry, finish carpentry, wood base, cabinets, doors, frames & HDW, glass & glazing, roofing, solatube skylights, skylights, insulation, acoustical ceilings, drywall, stucco patch exterior, carpet, sheet vinyl floor, ceramic tile, paint, toilet accessories, awnings, plumbing, mechanical, electrical, fire sprinklers. |
|
| BARTOLO SQUARE NORTH - PHASE II |
| Bid Date : Wednesday, September 29, 2010 |
Involves : See plans and specifications. |
|