| LIBRARY RENOVATION PROJECT |
| Bid Date : Monday, July 07, 2008 |
Involves : Comprehensive renovation of an existing kitchen-library building into an expanded library facility. |
|
| PARDALL ROAD ENHANCEMENT PROJECT |
| Bid Date : Tuesday, July 08, 2008 |
Involves : Pardall road enhancement project. |
|
| TEFT STREET & THOMPSON AVE. WATERLINE RELOCATION PROJECT |
| Bid Date : Tuesday, July 08, 2008 |
Involves : Traffic control, removal of existing water pipelines, earthwork, trench resurfacing, shoring, excavation, installation of water pipelines, concrete encasement of existing sanitary sewer, restore trenches. |
|
| LA CUESTA CONTIUATION HIGH MODERNIZATION-REBID |
| Bid Date : Tuesday, July 08, 2008 |
Involves : Modernization and ADA work related to limited site demolition, installation of stair and walkway, restroom renovations, concrete, paving, painting, rain gutters, door hardware, carpentry, electrical, plumbing, and minor utility improvements, etc. |
|
| LABORATORY RENOVATION 3166 |
| Bid Date : Wednesday, July 09, 2008 |
Involves : Selective demolition and subsequent renovation of room 3166, laboratories in Harold Frank Hall Building 556. Including, but not limited to new walls, doors and frames, interior finishes, fume hood, mechanical, electrical and lighting. |
|
| WATER RECLAMATION FACILITY SECONDARY ISLAND |
| Bid Date : Wednesday, July 09, 2008 |
Involves : In general, work consists of removing old piping, pump and motor and installing new City-furnished replacement pump and motor. |
|
| SHANDON HIGH SCHOOL DRAINAGE IMPROVEMENTS |
| Bid Date : Thursday, July 10, 2008 |
Involves : Removal of concrete and asphalt paving, grading, storm drainage system, and concrete paving. |
|
| RAILROAD SQUARE |
| Bid Date : Thursday, July 10, 2008 |
Involves : Historic renovation of existing 3 story URM and new construction of office wing (5,000 SF). Sub-bids only from all trades except architectural and structural. |
|
| CHORRO-HATHWAY WATER AND SEWER IMPROVEMENTS |
| Bid Date : Thursday, July 10, 2008 |
Involves : Install new waterlines and sewerlines and tie over services. Install new fire hydrant assemblies. Abandon existing waterlines and sewerlines, hydrants and laterals. |
|
| KAUTZ CHEVRON |
| Bid Date : Friday, July 11, 2008 |
Involves : Scrape and rebuild gas station: new food mart, carwash, canopy, fuel islands, and sitework. Sub-bids only from all trades except demo, grading, utilities, fueling, cabinets, and cooler. |
|
| STREET RECONSTRUCTION-WEST CRESTON STREET/ MARLBERRY STREET / PALMETTO |
| Bid Date : Tuesday, July 15, 2008 |
Involves : Reconstruction of valley gutters, spandrels, curb and gutter, handicap ramps, pavement striping and markings, and asphalt concrete pavement on West Creston Street, Marlberry Street and Palmetto Drive and all work necessary to render the facility complete and opperational. |
|
| FINAL COVER @ CHINA GRADE SANITARY LANDFILL |
| Bid Date : Wednesday, July 16, 2008 |
Involves : Clearing and grubbing, excavation, hauling and placement of a fianl earthen cover (evapotranspiration cover), general earthworks, surface water facilities, groundwater monitor well extensions, removal and reconstruction of existing landfill gas pipes and gas system modifications, construction of a pan lysimeter, geosynthetics liner installations, site security construction, placement of asphalt concrete and erosion control. |
|
| LA LOMA CURB AND GUTTER IMPROVEMENTS |
| Bid Date : Wednesday, July 16, 2008 |
Involves : Construction of curb and gutter, curb returns, portions of sidewalk and asphalt concrete paving. |
|
| VIA AVENUE BRIDGE REPAIRS |
| Bid Date : Thursday, July 17, 2008 |
Involves : Construct and complete the construction of the Via Avenue Bridge Repairs. |
|
| STAGE COACH ROAD STORM DAMAGE REPAIRS |
| Bid Date : Thursday, July 17, 2008 |
Involves : Stagecoach Road storm damage repairs cable mesh drapery system 3.5 miles Southeast of State Highway 154 near the City of Santa Barbara. |
|
| SANTA MARIA RIVER LEVEE PILOT CHANNEL PROJECT |
| Bid Date : Tuesday, July 22, 2008 |
Involves : Excavation and removal within the Santa Maria River bed or dirt, soil, earth, silt, trees, vegetation, debris or othe materials, in, over, under and across the real property shown on the plans, to serve the Flood Control PURPOSE. |
|
| SEWER PIPE RE-ROUTE |
| Bid Date : Wednesday, July 23, 2008 |
Involves : Install 775 L.F. (130 L.F. directional drilling) of 10" PVC sewer line and three manholes. Resurface trench line to match existing. |
|
| PAVEMENT REHABILITATION 2008 RAYMOND STREET NEIGHBORHOOD |
| Bid Date : Wednesday, July 23, 2008 |
Involves : Surface preperation & crack sealing, full depth AC base repair, cold milling and taper key, tree root pruning, removal and replacement of PCC sidewalk, curb & gutter, conventional AC overlay, traffic signal loop installation, pavement delineation & striping, and survey monument adjustment & replacement. |
|
| SIERRA HIGHWAY FROM AVENUE A TO ROSAMOND BLVD |
| Bid Date : Wednesday, July 23, 2008 |
Involves : Cold planing asphalt concrete; constructing an asphalt concrete overlay with pavement reinforcing fabric. |
|
| PAVEMENT LIGHTS AT CROSSWALKS |
| Bid Date : Thursday, July 24, 2008 |
Involves : Los Osos Valley Road in Pavement Lights at crosswalks Fairchild Way and Sunset Drive. |
|
| IN AND NEAR HARMONY (PLANT ESTABLISHMENT) |
| Bid Date : Thursday, July 24, 2008 |
Involves : In and near Harmony from 0.2 mile south of Harmony Valley Road to 0.6 mile North of Harmony Valley Road (Plant Establishment). |
|
| TYPE II SLURRY SEAL - MOBILE HOME PARK |
| Bid Date : Tuesday, July 29, 2008 |
Involves : Mobile Home Park pavements and fire station driveway. |
|
| EL COLEGIO ROAD IMPROVEMENT |
| Bid Date : Thursday, July 31, 2008 |
Involves : The construction of new west bound vehicle lanes & Class II bike lane from Stadium Road, through Los Caneros intersection. |
|
| PAVEMENT REHABILITATION BARDSDALE AREA |
| Bid Date : Tuesday, August 05, 2008 |
Involves : |
|